Cabled Seabed Observatory Gallery The seabed platform on the deck ready for deployment (May 2018) Τhe bottom of the ADCP which is mounted on top of the platform (May 2018) The connections of the camera and the acoustic recorder (May 2018) CO2 sensor (May 2018) CTD, Chl-A, Dissolved oxygen and Turbidity sensors (May 2018) The instrumentation system of the seabed platfrom (May 2018) The waterproof power jacks of the platform (May 2018) A closer look of the power jack (May 2018) The termination of the submarine electro-optical cable that will be deployed close to the seabed platform (May 2018) Deployment preparations start (May 2018) The platform is lifting from the deck (May 2018) The platform is lifting from the deck (May 2018) The platform approaches the water (May 2018) The platform approaches the water (May 2018) The platform enters the water (May 2018) The platform as seen by ROV's camera (May 2018) The platform approaches the sea bottom (May 2018) The platform is being plugged by the ROV (May 2018) Final adjustments are made by the ROV (May 2018)